Edge Lane Metrolink station

 Edge Lane
Manchester Metrolink
Station and track under construction in April 2010
Location
Place Droylsden
Local authority Metropolitan Borough of Tameside
Platforms 1 island
Fare zone information
Metrolink Zone
Present status Proposed station
History
Opening Summer 2012
UK Trams portal

Edge Lane Metrolink Station is a station under construction as part of Phase 3a of the Manchester Metrolink, and scheduled to open in the summer of 2012[1],located on the East Manchester line on Manchester Road adjacent to the junction of Edge Lane[2].

Services

Trams are scheduled along the East Manchester line westbound towards Manchester Piccadilly station before continuing through the city centre towards other destinations, whilst eastbound trams will head towards Ashton-under-Lyne. Trams will run every 12 minutes Monday-Saturday daytime, increasing to every 6 minutes at peak times. On Sundays and Bank Holidays, there will be a 15 minute service[1].

Preceding station   Manchester Metrolink   Following station
    Under Construction    
East Manchester Line

References

External Links